This question concerns the grounding point at the service entrance/equipment point in a residential circumstance:
If the grounding electrode conductor is connected to neutral and system ground at the service equipment point of an installation, and schedule 40 PVC is used for interconnect between the meter base and the service equipment panel, is there a grounding conductor required to connect the meter base metallic enclosure back to the main ground conductor at the entrance point?
Is there a difference between overhead service laterals and underground service laterals?
If the grounding electrode conductor is connected to neutral and system ground at the service equipment point of an installation, and schedule 40 PVC is used for interconnect between the meter base and the service equipment panel, is there a grounding conductor required to connect the meter base metallic enclosure back to the main ground conductor at the entrance point?
Is there a difference between overhead service laterals and underground service laterals?