I have an SE 325 Startco NGR with a 51G Relay for ground fault protection. The let through current is 5A so I have pick up at 20% (1A). So what does this mean if I have a ground fault downstream? Are my only choices to dump the whole plant or keep operating with the fault and just alarm it? Any suggestions for achieving selective ground fault protection if I want to trip the breaker when GF is detected? At what point if any does the code (CEC or NEC) require tripping the breaker?
Thank you.