allge
Electrical
- Jul 24, 2001
- 9
We presently have the responsibility to augment a grounding grid for an existing gas plant. Would someone be able to supply documented information or literature defining a distance between a metal body and a ground grid that would require the metal body to be bonded to the ground grid? Please let me know if more information is required to properly address this question. Thank you for your assistance, Gary