designres
Civil/Environmental
- May 12, 2022
- 10
Hi, I’m working on a deck renovation and the snow load is extremely high. Ground snow load is 372 psf. Crazy, right? There’s a deck on the second floor, above the garage and the client would like to remove the center post supporting the deck so the snow plow can get in closer to the garage, in the middle of the driveway. So, in order to size the new beam and posts, do I need to use the full ground snow load? Or is there a reduction since the deck is about 8’ off the ground? Thank you for any advice.