We are procuring a 607MVA transformer (345 KV to 22 KV) which we are storing as spare. As for the grounding requirements, while the transformer stays de-energized as spare, we were provided with three #4 gauge wires. We want to know if there is a spec (IEEE or ANSI) on such requirements particularly for Transformers that stay deenergized, except for the cooling bank that might be operational every 6 months through 480V circuit for routine checks. If any case would #4 gauge (3 phase) wire be adequate?