k26kv
Electrical
- Feb 4, 2010
- 5
We will have three cranes installing some new steel at the top of some towers between deenergized transmission lines. The towers are all within a 15 mile stretch of the transmission line and some of the guys are worried about "Circulating Current" between the three sets of grounds that will be installed for the cranes to lift the steel thru the lines to the top of the tower. Can someone explain this type of "Circulating Current" to me? I wouldn't think a crane operator would put a crane up thru the lines even if they are deenergized without them being grounded which some of the guys are suggesting.