Project: New addition with a basement going in next to an existing at grade commercial building.
To retain the soil/footing for the existing building, we are considering H piles and wood lagging next to the existing footings, then put a new concrete wall on the basement side once we get deep enough.
What happens when the lagging eventually deteriorates- is there a risk of the existing building settling?
What other options have people used for lagging in conditions like this?
Thanks