releky
Structural
- Oct 31, 2013
- 129
I always do beam pour all at one time or monolithic but I heard some engineers do it by stages especially those who don't use ready mix. For the case where the beam is poured one half first (left side) and then next day the other half (right side). There is a separation right in the middle. Wouldn't this have the same effect as flexural crack that goes above the neutral axis all the way to the compression zone splitting the beam in half?