Hi, I working on HRSG Fabrication with 9 Cr material, I have customer specification state that "If the assembly is not PWHT within 24 hours of the completion of welding, it shall be enclosed or covered and be stored 5 degrees above ambient temperature" I wonder what is the reason to store work piece at 5 degrees above ambient temperature? Also, spec require to Hold at 200 F for minimum 1 hrs before PWHT, What's the reason for that? Is all of this for allow hydrogen escape and keep hydrogen (Humid) away from weld?
Thanks for all answer.
Pook
Thanks for all answer.
Pook