We have a pipeline that will be constructed that has an area that has potential groundwater that is primarily driven by irrigation in the area. It is difficult to determine how much groundwater there will be at any given time or point. We will be bidding the project in the next month and one of the potential bidders has asked if the owner would accept the risk for the potential groundwater. Does anyone have any ideas how to setup a method to value the measures that the contractor might use so that we could determine a cost associated with those measures?