emedin
Civil/Environmental
- Apr 6, 2010
- 3
I'm currently designing an Inlet Works at an existing Wastewater Treatment Works. I've been asked to investigate re-using the existing Inlet Works and to do this I need to calculate the head over a double sided weir in order to determine the depth of flow at the downstream flume.
I can find guidance for calculating the head over a single sided weir but not a double.
Can anyone provide me with guidance or where I can reference material?
Kind Regards,
Ewen
I can find guidance for calculating the head over a single sided weir but not a double.
Can anyone provide me with guidance or where I can reference material?
Kind Regards,
Ewen