TECMSC
Mechanical
- Oct 6, 2005
- 45
We're considering two options for additional heat rejection. The problem is that on a design day our cooling towers run at their limits and we lose redundancy with them. The thought is to either add a 1000ton cooling tower to the existing ones (largest we can fit); or, add a 350 nominal ton air cooled chiller (largest we can use). Either option will take some load off the existing chiller plant.
We're limited to the 350T chiller but have flexibility on size of cooling tower. Prelim budget indicates cooling tower is less expensive. My first thought without doing any calcs is that the cooling tower is the way to go.
any thoughts? (is it this simple?)
Thanks in advance for any input!