Has anyone had any experience heat tracing / insulating a seismic separation assembly, per NFPA 13-2019 Figure A18.3(a)?
We have a 6-inch fire service line that runs across a building seismic / expansion joint that is currently insulated with 2-inch fiberglass / heat-traced. UL/FM-listed product recommendations that address this specific installation scenario are appreciated, if you know any! Thanks.