So we have this 300 sf residential addition. According to the geotech we need to use 26' min drilled pier penetrate minimum 10ft into bedrocck or refusal. Min 10" diameter with 25000 psf max bearing. Side shear 2500. Minimum dead load on the pier has to be 15000 psf.
Now we want to use helical piers instead. what are the things I need to pay attention to? Can I just spec the hellical piers to design load? Do i need to worry about the numbers the geotech eng gave us?
Now we want to use helical piers instead. what are the things I need to pay attention to? Can I just spec the hellical piers to design load? Do i need to worry about the numbers the geotech eng gave us?