Wilson2992
Structural
- Jul 21, 2011
- 2
I am considering the use of helical ties in a retrofit application. We have a 4" conc. block chase that was built adjacent to the 8" load bearing block wall. The block chase was not tied to the load bearing wall when built, and is now pulling away. Can anyone comment on the suitability of helical ties in this type of situation? Note that the total chase height is 12'.