glaxosmith
Mechanical
- Aug 26, 2007
- 3
I am working on one of its offshore project having field with wet sour H2S content . In data sheet of the slops tank ( UL-142 tanks D.P: 2.5 PSIG)& material showing HIC and SSC resistant. we are buying plate A516 GR 60 from Arcelor Mittal with HIC testing per NACE TM 0284 & Client specification and MTC states that material compliant to NACE MR 0175/ ISO 15156-2 & HIC test qualified
Also as per NACE MR 0175/ ISO 15156-2 section 7 Selection of pre qualified material resistant to SSC
" No additional laboratory testing of pre qualified material selected in this way require"
Now my question is
1) If the material is already Tested & passed for HIC test as per NACE TM 0284 & client specification also MTC stated for NACE MR 0175 / ISO 15156-2. DO we still required separate testing for SSC as per NACE TM-0177???.
As per my understanding for HIC qualification of plates it requires extra care during production phase of plate and SSC will automatically qualified once NACE MR 0175 section 7 calls for no separate testing as MTC already stated for HIC pass test result and compliance to NACE MR-0175/ ISO 15156-2. Also we have approached earlier a lot of mills but no one prepare to do both HIC & SSC testing on same plate with heat numbers saying only one test ( HIC OR SSC)can be performed. I have checked Client Specification which calls for HIC testing and Inspection for qualification but no separate specification for SSC specified. i dont want that at later stage client raise concern why plate is not SSC tested
Your valuable input will be much appreciate
Also as per NACE MR 0175/ ISO 15156-2 section 7 Selection of pre qualified material resistant to SSC
" No additional laboratory testing of pre qualified material selected in this way require"
Now my question is
1) If the material is already Tested & passed for HIC test as per NACE TM 0284 & client specification also MTC stated for NACE MR 0175 / ISO 15156-2. DO we still required separate testing for SSC as per NACE TM-0177???.
As per my understanding for HIC qualification of plates it requires extra care during production phase of plate and SSC will automatically qualified once NACE MR 0175 section 7 calls for no separate testing as MTC already stated for HIC pass test result and compliance to NACE MR-0175/ ISO 15156-2. Also we have approached earlier a lot of mills but no one prepare to do both HIC & SSC testing on same plate with heat numbers saying only one test ( HIC OR SSC)can be performed. I have checked Client Specification which calls for HIC testing and Inspection for qualification but no separate specification for SSC specified. i dont want that at later stage client raise concern why plate is not SSC tested
Your valuable input will be much appreciate