I am refitting an old industrial packaging hall into an office.
The old packaging hall had a VAV system installaed over 20 years ago (pretty forward thinking for then. We have stripped out all the old VAV boxes because they did not work and the controls were not working. However I would love to salvage the ductwork.
It is all circular ductwork up to the VAV boxes and the calculated duct air velocity is approx. 12m/s. Is this too high for an office installation. After the VAV box the air flow rate is down to normal low velicity.
Will I have noise problems with the high velocity in the circular duct.
All the bend are clean sweeps and the take offs are at
45 deg.
I am refitting an old industrial packaging hall into an office.
The old packaging hall had a VAV system installaed over 20 years ago (pretty forward thinking for then. We have stripped out all the old VAV boxes because they did not work and the controls were not working. However I would love to salvage the ductwork.
It is all circular ductwork up to the VAV boxes and the calculated duct air velocity is approx. 12m/s. Is this too high for an office installation. After the VAV box the air flow rate is down to normal low velicity.
Will I have noise problems with the high velocity in the circular duct.
All the bend are clean sweeps and the take offs are at