AnalyzingAlan
Civil/Environmental
- Nov 12, 2008
- 7
thread161-194365
I'm designing a large residential sewer pump station. Due to development phasing, the initial flows are much lower than final flows. The retension time during initial phases is unavoidably long given pump submergence requirements. Septic conditions is a concern, is a bubbler a solution? I am concerned about cavitation. I have seen bubblers in a dry well pump station design but never on a submerged pump wet well. Any input would be much appreciated
I'm designing a large residential sewer pump station. Due to development phasing, the initial flows are much lower than final flows. The retension time during initial phases is unavoidably long given pump submergence requirements. Septic conditions is a concern, is a bubbler a solution? I am concerned about cavitation. I have seen bubblers in a dry well pump station design but never on a submerged pump wet well. Any input would be much appreciated