Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

hit specific time values with automatic time step incrementation 2

Status
Not open for further replies.

raymondo1

Bioengineer
May 1, 2007
6
US
i am using abaqus 6.5 and i run an analysis with automatic time step incrementation. how can i specify certain fix times where i want to know the output values? help would be greatly appreciated.
 
Replies continue below

Recommended for you

You could just split the job up into seperate steps each of which was your required time for output.

corus
 
This was an enhancement request that was addressed back in V6.6 (May 2006)
 
"This was an enhancement request that was addressed back in V6.6 (May 2006)"

brep please tell me more please.
 
It is possible to request output in a number of different ways, now including at specified time points (they don't have to be uniform).

See section 14.12.2 (Field output) and 14.12.3 (History output) of the V6.6 ABAQUS/CAE Users manual
 
As corus said, why don't you split your step ?

Another solution would be to modify the default Dm factor under the *CONTROLS,PARAMETERS=TIME INCREMENTATION card (see Keywords Ref Manual) :
- specify an adequate initial increment
- set Dm to 1.0
But it is imho far more complicated ...


Eric
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top