I have several questions when placing the holdowns.
1.Do i need to place holdowns as shown in this picture if we have two shear walls in the same lines? or one side hold down sufficient?
2. Do i need to add timber posts, in corners and where ever holdowns are located or can i attach it to the 2x end stud of shear wall?
3. When doing the framing, do we need to add timber posts as shear wall end posts, and where ever possible to transfer the gravity loads ( where beams supporting)?
thank you