Galambos
Structural
- Jun 27, 2005
- 231
I am reviewing a cantilevered CIP concrete balcony bearing on a steel WF and attached to a hollowcore plank. the engineer has detailed the top reinf steel at the base of the cantilevered balcony to drop to the bottom layer about 12" from the face. He has also placed a hooked bar in the top layer that does not get developed into the building.
has anyone ever come across a similar detail? im trying to figure out its origin, because it looks really scary to me.
_________________________________
|_______________|_________________
CIP Balcony I Hollowcore (building side)
WF
has anyone ever come across a similar detail? im trying to figure out its origin, because it looks really scary to me.
_________________________________
|_______________|_________________
CIP Balcony I Hollowcore (building side)
WF