Minimum clearance between pipeline and pipe.
Of course it depends on competent soils, friction, size of block, pressure, degree of bend, pipe type, welded or push in, etc etc, All of which you say nothing. I don't read minds, or have a crystal ball.
Give us a plan and profile of the setup.
--Einstein gave the same test to students every year. When asked why he would do something like that, "Because the answers had changed."