Sojisub
Civil/Environmental
- Apr 8, 2021
- 10
I have a project where the contractor is using Horizontal Driving to install fusible PVC in the ground. During the reaming operation, they were running into rock which damaged their drill bits. Now they are claiming cost for repair to their drill bits and delay in their operations. There was a soil report but not for that location. Is this a justifiable claim? Should the contractor expect to run into some rocks?