tg103
Electrical
- Jan 7, 2005
- 15
Hi, I am new to this forum and hope someone can lead me in the right direction.
I have been a service technician at a local hospital for years providing power quality monitoring, infrared inspections, energized and de-energized equipment maintenance, and troubleshooting on many aspects of the hospital systems.
Recently I have been asked to put together a preventitive maintenance program on the Isolated Power Panel boards located in a section of the hospital. The panel boards are Square D 100A 240/120V IPP type with IsoGuard Line Monitors, some older Series A and a few Series D.
I am somewhat familiar with NFPA 99 and NEC 517-160 requirements and was wondering if someone could help me locate recommended PM's and/or testing procedures (preferbly energized) to prove the LIM's operation.
Thanks for any help!
I have been a service technician at a local hospital for years providing power quality monitoring, infrared inspections, energized and de-energized equipment maintenance, and troubleshooting on many aspects of the hospital systems.
Recently I have been asked to put together a preventitive maintenance program on the Isolated Power Panel boards located in a section of the hospital. The panel boards are Square D 100A 240/120V IPP type with IsoGuard Line Monitors, some older Series A and a few Series D.
I am somewhat familiar with NFPA 99 and NEC 517-160 requirements and was wondering if someone could help me locate recommended PM's and/or testing procedures (preferbly energized) to prove the LIM's operation.
Thanks for any help!