DeepuDivakaran
Mechanical
- May 24, 2016
- 9
Dear Experts,
We are planning for a hot tapping job with weldolet branch connection.Run pipe is API 5L and branch is A312 Gr TP 321. Electrode will be E309L. Line is Flare line. Size : 36" x 2". normal operating pressure is negligible,ie. 0.02 bar. Our plan is to purge the line with a min velocity of 1.5 m/s and max 10 m/s as it is gas line. As defined in client spec we have to maintain a min preheat of 65 deg C and max interpass temp of 250 deg C(FOR CS material). But here the case is dissimilar.
Experts please advice the preheat temp requirements for this case. Also what are the precautions I have to follow while hot tap welding the p8 to p1 joints.
We are planning for a hot tapping job with weldolet branch connection.Run pipe is API 5L and branch is A312 Gr TP 321. Electrode will be E309L. Line is Flare line. Size : 36" x 2". normal operating pressure is negligible,ie. 0.02 bar. Our plan is to purge the line with a min velocity of 1.5 m/s and max 10 m/s as it is gas line. As defined in client spec we have to maintain a min preheat of 65 deg C and max interpass temp of 250 deg C(FOR CS material). But here the case is dissimilar.
Experts please advice the preheat temp requirements for this case. Also what are the precautions I have to follow while hot tap welding the p8 to p1 joints.