Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

How Does Concrete Sampling for Cubes/Cylinders and Slump Happen in Your Neck of the Woods

Status
Not open for further replies.

BigH

Geotechnical
Dec 1, 2002
6,012
Just interested to see what kind of response we can get on the issue of proper concrete sampling.

As ASTM and BS EN (though in a round about way) say to sample, even for spot samples, to let the first part (0.3 to 0.5 m3) go, then commence spot or preferably composite samples, I have found on my Asian jobs, it is very difficult to get the concrete QC group to do this - they usually take the sample as the transit mixer arrives on site before any concrete "goes".

So what is done in your neck of the woods?
 
Replies continue below

Recommended for you

No takers, eh. Just trying to see how far off spec various areas go in sampling.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor