StructLin
Structural
- Jun 4, 2008
- 29
Hello Guys,
If you were asked to design a Tower foundation, It has following requirements:
The tower will be 4-legs, about 10'x10' square, 120'height.
need sitting on a dump pit trench wall(the dump pit trench also need you to design), the dump trench is about 500' long, the width depends on your decision as long as tower leg can sitting on the trench wall without failure, the trench wall top surface must be 4' above grade.
The soil report is given to you.
My question is how many hours (days) it will take you to complete the design job? (begining from various load calculations to end in all the finished detailed drawings).
Thanks.
If you were asked to design a Tower foundation, It has following requirements:
The tower will be 4-legs, about 10'x10' square, 120'height.
need sitting on a dump pit trench wall(the dump pit trench also need you to design), the dump trench is about 500' long, the width depends on your decision as long as tower leg can sitting on the trench wall without failure, the trench wall top surface must be 4' above grade.
The soil report is given to you.
My question is how many hours (days) it will take you to complete the design job? (begining from various load calculations to end in all the finished detailed drawings).
Thanks.