I'm in a mid to high seismic zone and I'm doing research for the preliminary design of an 8 story office structure. The developer's contractor is claiming they've used lightgage that tall on past projects, but I'm not convinced the lateral system will work in any seismic area. Strap bracing just wont cut it.
Am I off the mark, or is there some sort of special strapping system that can be used? The building is about 250' long with a stairwell on each end.