-
1
- #1
ANE91
Structural
- Mar 31, 2023
- 164
Had a friendly lunch with some sorta-competitors in my market who were very frank about never doing calcs for their work. Work ranges from design to repairs/retrofits, almost all wood. Are they messing with me or what? Obviously, a practitioner can output more work without pausing to do any pesky analysis.