ilkea
Aerospace
- Apr 7, 2006
- 9
hi,
today, I prepared an assembly drawing in which basicly two pieces will be assembled together, the problem is, there should be a liner material in between. The thickness of the liner will be at most 0.1mm. So, what I did is, in bill of material on the drawing I gave the three components, i.e the two pieces that will be assembled and the liner material. But on the drawing I only put ballons to the two pieces, and in the notes I wrote, "before assembling part 2 to part 1, the liner will be applied to the part 1 according to the document xyz. " and I did NOT put a ballon to the liner. And this caused a little (!) argument with my project manager.
So is there a problem in what I did?
because of the argument, I was asked to prepare a formal report on this problem. So I need to refer a standart while explaning this. Could you please help me?
thanks in advance...
today, I prepared an assembly drawing in which basicly two pieces will be assembled together, the problem is, there should be a liner material in between. The thickness of the liner will be at most 0.1mm. So, what I did is, in bill of material on the drawing I gave the three components, i.e the two pieces that will be assembled and the liner material. But on the drawing I only put ballons to the two pieces, and in the notes I wrote, "before assembling part 2 to part 1, the liner will be applied to the part 1 according to the document xyz. " and I did NOT put a ballon to the liner. And this caused a little (!) argument with my project manager.
So is there a problem in what I did?
because of the argument, I was asked to prepare a formal report on this problem. So I need to refer a standart while explaning this. Could you please help me?
thanks in advance...