SYED SHEERAZ AHMED
Civil/Environmental
- Jun 3, 2023
- 2
Hey there,
I have some queries. I have a geotechnical report recommends for foundations placement and it recommends to place 250mm thick layer of Structural Fill material. The material should have a size of 3-4 inches and the compaction value shall not be less than 99%.
Now after compaction how to confirm that required compaction is achieved. FDT is not working on 3-4 inches of particle size and we are also unable to find proctor values.
Can any body confirm about this? Which test should I perform for this?
I have some queries. I have a geotechnical report recommends for foundations placement and it recommends to place 250mm thick layer of Structural Fill material. The material should have a size of 3-4 inches and the compaction value shall not be less than 99%.
Now after compaction how to confirm that required compaction is achieved. FDT is not working on 3-4 inches of particle size and we are also unable to find proctor values.
Can any body confirm about this? Which test should I perform for this?