william6346
Computer
- May 23, 2003
- 1
1.0 Multiple SATCHWELL BMS worsktations exist in plant.
2.0 Requirement is to implement a SCADA system, which would integrate these individual BMS workstations.
2.1 Requirement is also to make available on plant network, all read-only data, to designated PCs.
3.0 Please advise re. "Best Practice" architecture, including necessity for routers etc.
3.1 To what extent should the SCADA network be segregated from the overall plant network?
Kind regards....William
2.0 Requirement is to implement a SCADA system, which would integrate these individual BMS workstations.
2.1 Requirement is also to make available on plant network, all read-only data, to designated PCs.
3.0 Please advise re. "Best Practice" architecture, including necessity for routers etc.
3.1 To what extent should the SCADA network be segregated from the overall plant network?
Kind regards....William