JosephERG
Industrial
- Nov 1, 2007
- 20
Hi All,
I would like to inquire if any of you guys, especially
those in the fabrication business, can provide information on how to determine the "target yield".
In our company, QC engineers are required to set the target yield for each process involved in the manufacture
of our products. This value is used to monitor the process performance (whether it is low yield or not).
Currently, the target yield for each process is determined by getting their average within the previous 6 months (or more). Is our method correct?
Please advise. Thank you very much.
I would like to inquire if any of you guys, especially
those in the fabrication business, can provide information on how to determine the "target yield".
In our company, QC engineers are required to set the target yield for each process involved in the manufacture
of our products. This value is used to monitor the process performance (whether it is low yield or not).
Currently, the target yield for each process is determined by getting their average within the previous 6 months (or more). Is our method correct?
Please advise. Thank you very much.