Hi All
I have a pipe ( clamped from one side ) while a lateral load and a moment is being applied to the other end. due to the geometry difficulties, I need to install the strain gages near the loading end, where also the fracture happens. the loads are being applied in a harmonic regime under 10 Htz.
I would like to know how to install them ( orientations ) and calculations ( do they enter in polar coordinates ?) and possible errors and maximum temperature I can use a strain gage( this last one just for info)
I have a pipe ( clamped from one side ) while a lateral load and a moment is being applied to the other end. due to the geometry difficulties, I need to install the strain gages near the loading end, where also the fracture happens. the loads are being applied in a harmonic regime under 10 Htz.
I would like to know how to install them ( orientations ) and calculations ( do they enter in polar coordinates ?) and possible errors and maximum temperature I can use a strain gage( this last one just for info)