Andengel
Mechanical
- Nov 19, 2012
- 2
Hi,
I have made a transient analysis of an offshore windmill, and traced the top node during an interval of 100 seconds with the NSOL-command. This gave me a maximum deflection occurring at 20 seconds.
How do i plot the Von Mises-stress for this time?
I have made a transient analysis of an offshore windmill, and traced the top node during an interval of 100 seconds with the NSOL-command. This gave me a maximum deflection occurring at 20 seconds.
How do i plot the Von Mises-stress for this time?