Hello
I have created a tabular note 800mm high.
As it is too high to enter in may sheet, I have overflowed it by defining the maximum height 500mm.
I've got now a first half table 500mm high and a second half table 300mm high.


Problem : when I modify a cell of the second half table, the update doesn't work.

Do you know why ?

For information :
- if I modify a cell of the first half table , the update is correct
- if I define the maximum height to 2000mm and then come back to 500mm , update is correct. But not very interesting process...

 
Replies continue below

Recommended for you

Interesting. I have just created a table and edit this table with spreadsheet. Then, I have changed in spreadsheet the value for the cell in second table and it worked. The cell was updated.
What kind of modification are you doing? Just a change of the cell value or something else?
Did you try to update with Tools/Update options?
I have done my test on Nx7.5.5.4.
 