Hi All,
I would like to keep number of Quantity parts required for each part in part level drawing.
For Example:
I have
Assy.prt
To make Assy.prt total two part1.prt parts and one part2.prt is required. So in part1.prt part level drawing I need to mention 2 qty required for assembly. This information will useful for procurement team.
In the previous posts
Niedzviedz has posted journal
Journal thread for adding no of parts in quantity attribute in each child part then we can call in part level drawing. so far it's working great.
Now I want add one more part (example: part1.prt) in assembly. So Quantity of part1.prt will be 3, If I re run the journal it qty attribute is getting update Instead of that is there any way to make it auto update like parts list update
Regards,
Gani
I would like to keep number of Quantity parts required for each part in part level drawing.
For Example:
I have
Assy.prt
part1.prt
part1.prt
Part2.prt
To make Assy.prt total two part1.prt parts and one part2.prt is required. So in part1.prt part level drawing I need to mention 2 qty required for assembly. This information will useful for procurement team.
In the previous posts
Niedzviedz has posted journal
Journal thread for adding no of parts in quantity attribute in each child part then we can call in part level drawing. so far it's working great.
Now I want add one more part (example: part1.prt) in assembly. So Quantity of part1.prt will be 3, If I re run the journal it qty attribute is getting update Instead of that is there any way to make it auto update like parts list update
Regards,
Gani