Hello,
I am re-purposing the mast/cylinder and pump from an old electric forklift as a stationary lift.
I am an instrumentation designer / technician and don't usually get into hydraulic circuits ( just the electrical end ).
Can someone review my design. I would appreciate any advice or comments.
There is actually two designs. They are almost identical. The only difference is that one uses a 3 position 4 port valve and the other a check valve and 2 position 2 port valve.
The 3 position valve give two ways of stopping the lift ( valve and motor ) and better approximates what was there originally ( a manual spool valve that had a switch on it to start the motor).
The 2 position valve and check valve is how most simple ( cheap ) dump trailers are built.
Thanks so much ....... Mike
I am re-purposing the mast/cylinder and pump from an old electric forklift as a stationary lift.
I am an instrumentation designer / technician and don't usually get into hydraulic circuits ( just the electrical end ).
Can someone review my design. I would appreciate any advice or comments.
There is actually two designs. They are almost identical. The only difference is that one uses a 3 position 4 port valve and the other a check valve and 2 position 2 port valve.
The 3 position valve give two ways of stopping the lift ( valve and motor ) and better approximates what was there originally ( a manual spool valve that had a switch on it to start the motor).
The 2 position valve and check valve is how most simple ( cheap ) dump trailers are built.
Thanks so much ....... Mike