ar9
Civil/Environmental
- Feb 25, 2013
- 30
I am modeling a Basin and would like to analyze the idea of culverts with a check valve. I have added these as outlets to the model. Is there a way to input the amount of time/day the culverts will flow? Or, is there a way to set DIFFERENT tailwaters at different hours of the day? Basically, the culverts will only add outlet capacity when the drainage basin is at or below 0' (approx. only 6 hours per day).
Also, is there a way to possibly include evaporation to a pond in HydroCAD?
Thanks
ar9
Also, is there a way to possibly include evaporation to a pond in HydroCAD?
Thanks
ar9