thiru4vino
Chemical
- Jun 25, 2002
- 41
Dear Friends
I am working in a Oil Gathering center where hydrocyclone package (Petreco) was installed 5-6 years ago, but not utilised properly. The hydrocyclone and Deoiling vessel (Induced Gas Floatation Unit (Fuelgas)) are designed to handle, say 10000 BPD of oily water from a 3-ph separator whereas the maximum produced water continuously available is 2000 BPD. Design specs: 500 ppmv of oil (inlet) and 50 ppmv (outlet). Package was not brought to regular service since long for reasons stated as "Non-availability of minimum water flow required" and "Scaling inside hydrocyclones". I understand that both demulsifier & anti-scale injections were made available then. Now I am with a team that is asked to revive these units. I am a greenhorn to this area & need experts to opine on what need to be checked out before proceeding to line-up the system & also on how to optimise the system with less water.
I am working in a Oil Gathering center where hydrocyclone package (Petreco) was installed 5-6 years ago, but not utilised properly. The hydrocyclone and Deoiling vessel (Induced Gas Floatation Unit (Fuelgas)) are designed to handle, say 10000 BPD of oily water from a 3-ph separator whereas the maximum produced water continuously available is 2000 BPD. Design specs: 500 ppmv of oil (inlet) and 50 ppmv (outlet). Package was not brought to regular service since long for reasons stated as "Non-availability of minimum water flow required" and "Scaling inside hydrocyclones". I understand that both demulsifier & anti-scale injections were made available then. Now I am with a team that is asked to revive these units. I am a greenhorn to this area & need experts to opine on what need to be checked out before proceeding to line-up the system & also on how to optimise the system with less water.