Can anyone share the experience of how they developed the control logic for hydrogen feeding for a batch hydrogenation reactor?
Was it a pressure control loop or flow control loop or cascade system. Please help
Or although I doubt but was it a temperature loop
 
Replies continue below

Recommended for you

If you feed the hydrogen based on pressure it will automatically flow into the reactor as it is consumed. Use a hydrogen pressure regulator to accomplish this. It is not fancy but effective. You could use a mass flow meter to measure the amount of hydrogen charged if that is something you want to know.

 
Vishal Kumar said:
Was it a pressure control loop or flow control loop or cascade system.
Both options are possible depending on process design. Describe your case in details and post PFD/P&ID.
 