LanceM
Mechanical
- Sep 24, 2016
- 11
Hello,
Our company was planning to do a sectional replacement of the thinning tower shell due to CUI. The problems that arose were:
1. As of the latest UT data of the tower, bottom ellipsoidal head can no longer withstand the hydrotest pressure.
2. Even if we do leak test pressure only, the documents for the foundation analysis were no where to be found.
If it helps, the design pressure of the tower is 310 kPag with operating pressure at 139 kPag at 141 degrees Celcius.
So with those in mind, are there any other alternatives for hydrotest? I've read on API 510 that an appropriate NDE may be performed however it didn't specify any.
Our company was planning to do a sectional replacement of the thinning tower shell due to CUI. The problems that arose were:
1. As of the latest UT data of the tower, bottom ellipsoidal head can no longer withstand the hydrotest pressure.
2. Even if we do leak test pressure only, the documents for the foundation analysis were no where to be found.
If it helps, the design pressure of the tower is 310 kPag with operating pressure at 139 kPag at 141 degrees Celcius.
So with those in mind, are there any other alternatives for hydrotest? I've read on API 510 that an appropriate NDE may be performed however it didn't specify any.