ChemGuy2016
Chemical
- Dec 6, 2016
- 20
I know this has been discussed before, but I want to bring it up again: I would like to hear different people's methods of labeling lines on a set of multiple P&IDs. Right now I have 1"-SS1-001 (line size-pipe material-sequence number), but it gets very messy each time I add or delete a line. So now the lines on a P&ID seem entirely random. I've read about using Equipment From:Equipment To in the tag, but my main issue with that is how do you label a pipe that is connecting between two other pipes, or T's? I would love to hear people's systems that they commonly use.
Thanks!!
Thanks!!