NickParker
Electrical
- Sep 1, 2017
- 397
All outgoing units shall be executed as fully withdrawable units complete with test facilities, i.e. all connections to vertical busbars and outgoing power and control cables shall be via plug/sockets/sliding contacts and no (test supply) disconnections are required when the unit is to be put into the test position.
Is it the the control power disconnection when in test position? It is common to provide separate control power when the starter unit (withdrawable unit) is in Test position
What is the intention of this clause?
Is it the the control power disconnection when in test position? It is common to provide separate control power when the starter unit (withdrawable unit) is in Test position
What is the intention of this clause?