cmichaud75
Geotechnical
- Dec 2, 2008
- 1
We have a project that has 200 feet of medium dense native clean fine to medium sand. Site development includes a tapered fill from 1 to 50 feet to achieve finish floor elevation. The fill will consisit of the same native sand cut from other areas of the site. Groundwater is greater than 100 feet deep. We have calculated anticipated immediate settlement from the weight of the fill using Schmertmann method. Considering a wide base width of 100 feet (plan area of the fill) and depending on the equation used for Es (stress-strain modulus), we are calculating up to 12 inches of settlement. Given the wide base width, the load influence penetrates very deep. I know this is supposed to be "immediate" settlement, but will settlement really happen incrementally as the fill is placed? Should I be concerned with differential post-construction settlement of the building that is placed on the extremely different fill depths? Any other general considerations for this situation?