SteelPE
Structural
- Mar 9, 2006
- 2,759
I am currently working of a hanging TV system that will hang above a bar inside a restaurant that I designed. During the initial design phase I was not responsible for this portion of the project, however, this has now changed. Unfortunately I had to include this weight in the design of my roof and nobody was willing to go on record as to what the weight actually was. So I did the best that I could and now it appears that I may be a little short. Originally I was figuring for an impact load on this system (don’t know why it just seems like something I should have done). Now I have to be a little more exact and the impact factor may need to go.
I was wondering if others would include an impact loading on this hanging system and if so, what impact factor would you use?
Why do these things never end up the weight I originally estimate???? I should just figure 2.5x the weight everyone says it is then I won’t have to worry about these things later on when they get larger than expected.
Code would technically be IBC 2003.
I was wondering if others would include an impact loading on this hanging system and if so, what impact factor would you use?
Why do these things never end up the weight I originally estimate???? I should just figure 2.5x the weight everyone says it is then I won’t have to worry about these things later on when they get larger than expected.
Code would technically be IBC 2003.