I have a headache with the previous issue and really need your help.
I need to run two simulations as a whole process, the first one is static and the second one is transient, they are two back to back process. As far as I know, I cannot solve them at once or even use Restart command to run the transient after the static.
Any of you know how to solve this problem, is there any way to put all the stress result from the static model into the transient model before running it? (I'm interested in the stress result)
Any help is highly appreciated since it takes me 3 weeks so far but I couldn't get it work. Thanks!
I have a headache with the previous issue and really need your help.
I need to run two simulations as a whole process, the first one is static and the second one is transient, they are two back to back process. As far as I know, I cannot solve them at once or even use Restart command to run the transient after the static.
Any of you know how to solve this problem, is there any way to put all the stress result from the static model into the transient model before running it? (I'm interested in the stress result)
Any help is highly appreciated since it takes me 3 weeks so far but I couldn't get it work. Thanks!