Yooper
Electrical
- Sep 19, 2002
- 10
I was looking for some information regarding a question from an electrician at my facility.
We currently ground out all busswork while doing PM work on it. The reason being is obviously to avoid any induced voltages which could be harmful to the workers.
The question is: Is it possible to get enough of a induced voltage on relay control wiring to induce a voltage on the buswork through the CT?
Thanks
We currently ground out all busswork while doing PM work on it. The reason being is obviously to avoid any induced voltages which could be harmful to the workers.
The question is: Is it possible to get enough of a induced voltage on relay control wiring to induce a voltage on the buswork through the CT?
Thanks