Hey all,
While this might be up Ron's alley - perhaps others have had some experience. I am looking to see if there is any "hard" or even "luke-warm" information on the actual construction activity affecting the strength of concrete - like, poor vibration - potential loss of 15%; moving concrete with vibrator - 10%, "shooting" pumped concrete through reinforcing steel mats. (my numbers were made up)
Would appreciate any data/references on this . . . am putting together a presentation to our and the contractor inspection staff on inspection of concrete - pre-placement; placement; and post-placement.
Cheers to all - have a great Easter/Passover - or just a great couple of days!
BigH
While this might be up Ron's alley - perhaps others have had some experience. I am looking to see if there is any "hard" or even "luke-warm" information on the actual construction activity affecting the strength of concrete - like, poor vibration - potential loss of 15%; moving concrete with vibrator - 10%, "shooting" pumped concrete through reinforcing steel mats. (my numbers were made up)
Would appreciate any data/references on this . . . am putting together a presentation to our and the contractor inspection staff on inspection of concrete - pre-placement; placement; and post-placement.
Cheers to all - have a great Easter/Passover - or just a great couple of days!
BigH