All expert,
Assumption, a new pressure vessel manufacturer.
They would follow ASME system with U certificate.
They would like to build NDE system with person, procedure, equipment and written practice.
Of course, the personal qualification meet any Level II as ASNT SNT-TC-1A requirement.
My question is
1. How to assign the initial Level III?
2. As follow ASME Sec. V, The NDE Level III shall certified to be capable of training and examining NDE Level I, Level II, and Level III personnel for certification in those methods.
If Level III is subcontract by other agency, Who have qualification to certify this subcontract Level III?
3. A level III to be qualified by other Level III,.... infinity cycle, I think, it's not code real intention.
Assumption, a new pressure vessel manufacturer.
They would follow ASME system with U certificate.
They would like to build NDE system with person, procedure, equipment and written practice.
Of course, the personal qualification meet any Level II as ASNT SNT-TC-1A requirement.
My question is
1. How to assign the initial Level III?
2. As follow ASME Sec. V, The NDE Level III shall certified to be capable of training and examining NDE Level I, Level II, and Level III personnel for certification in those methods.
If Level III is subcontract by other agency, Who have qualification to certify this subcontract Level III?
3. A level III to be qualified by other Level III,.... infinity cycle, I think, it's not code real intention.